Frontline Frames
← All guides
FAQs

Plate Frames for Multi-Location Dealer Groups: A FAQ

The central decision for a dealer group is whether every rooftop runs the same frame design or its own. One shared design consolidates volume into a better pricing tier and takes one approval; per-store designs carry each location's name and number but split the run into separate production setups. Most groups end up with a hybrid, and the sooner that rule is written down, the cheaper it gets.

Should every rooftop in a group use the same frame design?

Use one design where the group brand is what customers recognize, and per-store designs where the store name and local number drive response. The test is what a customer would say when asked where they bought the car. If they name the group, standardize; if they name the store, localize.

Mixed-brand groups usually cannot standardize fully anyway, because OEM branding rules differ by manufacturer and a shared frame would violate at least one of them.

What does standardizing a design actually save?

Volume and time. A single design lets you combine every store's quantity into one order, which lands in a better pricing tier than the same total split five ways, and it collapses five artwork approvals into one. Each additional design is its own production setup regardless of how the frames ship.

ApproachPricing effectBest when
One group-wide designAll volume in one tierGroup brand is the recognized name
One design per rooftopVolume splits per designStore name and local number matter most
Hybrid: shared layout, variable lineVolume splits, approvals do notConsistent look, local contact detail

It also shortens every future reorder. A single approved design means a repeat order is a quantity decision rather than a design project, which is the difference between a ten-minute task and a three-week internal loop involving five store managers.

How does a hybrid design approach work?

Lock the layout, typeface, colors and logo treatment at group level, and let one line vary per store — usually the city or the phone number. Every rooftop looks like it belongs to the same organization, and each one still carries a local detail. It is still separate production per variant, but the design work happens once.

Write the locked elements into a one-page internal standard. Without it, the third store to reorder will quietly pick a different font and nobody will notice for a year.

Should a group order centrally or let each store order?

Centralized ordering buys better tiers and enforces brand consistency. Store-level ordering is faster and matches local usage more accurately. The common middle path is central design control with store-level quantity: marketing owns what the frame looks like, each rooftop owns how many it needs.

Whichever you pick, name an owner. The failure mode in every group is the same — everyone assumed someone else was reordering.

Central ordering also protects against the slow drift that happens when each store reorders independently. Two years of independent reorders across five rooftops reliably produces five slightly different frames, and nobody can say when it happened.

How do we handle stores with different sales volumes?

Set quantities per rooftop from actual frames consumed, not from an even split. A high-turn store and a low-volume specialty lot with the same allocation produces one location running out mid-quarter and another storing boxes it will never open. Count usage per store for three months and allocate from that.

Count everything that leaves each building, not retail deliveries alone — wholesale units, loaners, demos, service giveaways and frames damaged during installation all draw from the same case. Stores with a large service operation consume far more than their sales numbers suggest.

Revisit the allocation twice a year. Volume shifts between rooftops faster than most groups update their standing quantities, and the store that was smallest last year is often not smallest now.

Can one order ship to multiple locations?

Raise it before ordering, through contact, because split shipments involve extra handling and their own freight. The alternative is shipping everything to one location and redistributing internally, which is cheaper on freight and more expensive in staff time. Neither is universally right — it depends on how far apart the rooftops are.

Distance is the deciding factor. Rooftops within the same metro can usually be served from one delivery and an hour of someone's afternoon; rooftops in three states cannot, and the internal freight you would pay to redistribute them erases the savings.

Whichever route you choose, confirm the receiving contact at each address. Pallets left at a store with no named recipient have a habit of sitting in a service bay for two weeks.

What about acquisitions and rebrands?

Time the frame order to the sign change, not to the closing date. Frames printed with an old store name are dead stock the moment the sign comes down, and frames printed with the new name are useless while the old sign is still up. The window is narrow and worth planning around.

During a transition, order shorter and more often. Higher unit cost is cheaper than a pallet of frames for a name that no longer exists.

How do we keep branding consistent across rooftops?

Three things in a shared document: the approved logo files, the exact text strings for each store, and the locked design elements. Store the files somewhere permanent — not in one person's inbox — and note which frame material and finish is the group standard. Every consistency failure traces back to a missing one of these.

Name one owner at group level for artwork approval, with store managers giving input on their own text lines only. Design by committee across five rooftops produces a frame that satisfies nobody and takes six weeks to approve — which, against a 2–3 week production window, is how a launch date is missed before anything is ordered.

Do different OEM brands in one group need different frames?

Usually yes, if the manufacturer's mark appears. Each OEM publishes its own brand guidelines covering logo lockups, clear space and approved colors, and those rules govern whether a dealer may combine their mark with a group identity. Check each brand portal separately; do not assume one manufacturer's approval carries to another.

Frames carrying only your group's own branding are simpler, because the constraints are yours rather than the manufacturer's.

Co-op reimbursement often rides on the same guidelines, so treat compliance as a condition of getting paid rather than as paperwork. Clear the design before production; a compliance problem found after a thousand frames are printed is not fixable.

Can each rooftop have its own subscription?

Yes, and for groups with per-store designs it is usually the cleanest structure — each location gets its own design, quantity and cadence. Groups running one shared design more often use a single consolidated subscription with internal distribution, because that keeps all the volume in one tier.

Either structure lets you change a design between cycles, so a store that updates its phone number does not have to wait for a group-wide reset. Match the cadence to each store's burn rate and to how much storage it actually has.

How do we track frame inventory across several rooftops?

A single shared sheet with three columns per store — current stock, monthly usage, reorder point — beats any system nobody updates. Have each location report stock on the same day each month. The visibility matters more than the tooling; groups rarely run out because they lacked software, they run out because no one was counting.

Set each store's reorder point at one full replenishment cycle of usage plus a buffer, since production runs 2–3 weeks before transit.

What is the first step for a group starting from scratch?

Decide the design rule before pricing anything: shared, per-store, or hybrid. Every downstream decision — quantities, tiers, shipping, subscriptions — follows from it. Then build the standard design in the builder, see the tiers at group volume, and read how it works before rolling it to the rooftops.

Design your dealership’s frames

Upload your logo, pick your material, and see exact pricing for your quantity.

Start Designing